CUSTOMER
Barberton City School district
WHAT WE DID
Architectural Design / Interior Design / Roofing
PROJECT DESCRIPTION
New Barberton ES West (K-4): OFCC-CFAP, $16.8M, 86,400 SF, The facility is two-story following the natural contours of the existing property. Natural daylighting from the north and south side into the academic classrooms provides comfort and efficiency. The site amenities include several outdoor learning areas, large playground and athletic fields. Multiple Prime with CM as Agent delivery method.
Barberton ES East Addition/Renovation (K-4): OSFC-CFAP, $16.5M, 94,200 SF. This project included a Kindergarten addition that incorporated roof monitors to bring daylighting into the academic classrooms. Many of the existing spaces were re-programmed for different functions. The exterior design of the facility mimicked adjacent historical landmarks. Multiple Prime with CM as Agent delivery method.
New Barberton MS (5-8): OFCC-CFAP, $27.3M, 153,600 SF. This new 2-story facility for 1,400 students is located on an urban site, which required the demolition of existing buildings and soil stabilization. The new facility has (54) classrooms that include special education and science labs, (2) gymnasiums, (2) art and music rooms, band room and a vocal room. The media center is located on the second floor above the administrative area and utilizes natural daylighting from the north and south. Multiple Prime with CM as Agent delivery method.