CUSTOMER
Keystone Local School District
WHAT WE DID
Architectural Design / Interior Design
PROJECT DESCRIPTION
New $17.5M, 105,000SF 9-12 High School ELPP project on 65-acre campus with separate academic and event entrances and natural daylighting provided in media center with 180 degree views. The Music Room is located on the backside of the stage with operable partition to allow convenient access for performances. Classroom wings are separated by floor and wing. Multi-purpose space was created adjacent to gymnasium with reverse-folding bleachers that are used for the student section during events. Career Tech spaces were also included in the program. Multiple Prime with CMA.