Manchester High School

FMD Architects helped the district with master planning, pre-bond services, and community engagement before being selected to design the new 86,193-square-foot Manchester High School. FMD also provided interior design, construction documentation, and construction administration.

As construction costs rose, FMD worked with the district and its construction manager at risk to meet the requirements of the Ohio School Design Manual and address the district’s educational needs. With limited local funding for additional features, the team designed spaces that could serve more than one purpose.

The Manchester Innovative Learning Lab brings the media center and technology labs together. A multipurpose room serves as both the school’s dining space and an auditorium.

Services Provided

Interior Design, Construction Documents, Construction Administration, Master Planning, Pre-bond/ Community Engagement, Design
“Thanks so much. I think our whole team is really relieved to officially be able to have FMD on board and helping us through the process now!”
Joe Hercules,
Board President